Week 3 -  September 22-28, 2003

The two pictures below are from Monday September 22

We have a roof.....well, sort of.

Picture below from Wednesday, September 24th

Pictures below are from Thursday, September 25th

Tar paper on the roof, ready for the shingles

Elizabeth standing in front of our fireplace in our soon-to-be living room

Elizabeth looking out from the stairway window

Below is how the house looked on Friday.  Looks like we now have windows!

In the garage was the tub from the guest bathroom and also the garden tub for the master bathroom.

I nominate Elizabeth as the official window cleaner!  Get to work Elizabeth.  :-)

 

These pictures from Saturday night, looks like the majority of the plumbing was put in today.

The second floor plumbing as seen from the kitchen on the first floor.

Elizabeth standing next to where the refrigerator will be.  Do you see the ice maker hook up in the bottom left of the picture?  The red pipe on the right hand side of the picture is the hot water line for the sink in the half-bath.

Here is the garden tub and the basin for the stand-up shower in the master bath.

Plumbing for the guest bath. The plumbing in the background is for the washing machine hookup in the laundry room.